AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Crane lift plans are required when1/25/2024 ![]() ![]() Overhead Crane Bridge, Monorail, Gantry Worksheet for Construction (F416-141-000).Notice of Deficiencies (Crane/Derrick Certification Examination) (F416-054-000).Mobile Cranes/Derricks Worksheet for Construction Industry (F416-043-000).Application for Accreditation Cranes/Derricks and other Material Handling Devices (F416-063-000).Standard Hand Signals for Cranes Resources OSHA Directive CPL 02-01-057 - Compliance Directive for the Cranes and Derricks in Construction Standard. ![]() ![]() Working Around Overhead Energized Trolley Lines ( DD 18.70).Auditing Accredited Crane Certifiers (DD 8.80).Construction Crane Certification and Crane Operator Qualifications and Certification (DD 8.60).Rolling Outriggers on Mobile Cranes (DD 7.00).The crane certifier requirements ( WAC 296-155-531 through WAC 292) are in effect to accredit crane certifiers. Here are some of the required personnel when using a crane (A single individual may perform one or more of these assignments concurrently). (additional requirements for tower cranes) Search for applicable Rigging rules and resources General requirements for all construction cranes/machinesĪll cranes and derricks covered in WAC 290 and not exempt in subsection (3) of that section, must be inspected and proof load tested annually by an accredited crane certifier recognized by the department. ![]()
0 Comments
Read More
Leave a Reply. |